Projects
Steel Factory
The foundations of Steel Factory that is the first integrated iron and steel factory of Turkey were laid by the term Prime Minister İsmet İnönü on 10th September of 1939 as one of the national industrializations moves of the founder of their republic, Mustafa Kemal Atatürk. They fired up their first blast furnace on 9th September 1939 and on the following day, 10th September 1939, they produced the first Turkish Iron.
They actualized the project designing, manufacturing and installation of a large number of major industrial plants by leading their country’ s industrial enterprises. Therefore; they are known in Turkey as “the factory establishing factories” and memorialized by this name.
KVM scope of work:
SIMOPRIME extension Panels for steel factory Phase 1 & 2.
Delivery period: 2018 / 2019
SIEMENS /TR
Istanbul International Airport
Istanbul International Airport is one of three international airports serving Istanbul, the largest city in Turkey. Located 32 km (20 mi) southeast of the city center, Sabiha Gökçen Airport is in the Asian part of the bi-continental Istanbul and serves as the hub for some airlines, including Pegasus Airlines as well as a secondary base for Turkish Airlines and Borajet.
Although Istanbul Airport, located 63 km (39 mi) away on the European side of Istanbul, is larger, Sabiha Gökçen is still one of the largest airports in the country.
KVM scope of work:
SIMOPRIME extension Panels for Istanbul International Airport
Delivery period: 2018
SIEMENS /TR
Cement Factory
Located in the Western Black Sea Region in Turkey, Bartın Cement was a public sector company until 1993, when it was sold to the private sector through the privatization efforts of the time. SANKO acquired the company in 2005. Bartın Cement has a production capacity of 1 million metric tons of clinker and 1.5 million metric tons of cement per year.
KVM scope of work:
SIMOPRIME extension Panels for Cement factory.
Delivery period: 2018 / 2019
SIEMENS /TR
Upgrade Project in PAP
Ma’aden is now among the fastest growing mining companies in the world and the largest multi-commodity mining and metals company in the Middle East. They’ve come a long way since 1997, when They were established by Royal Decree with a mandate to develop Saudi Arabia’s minerals sector as the third pillar of Saudi industry, beyond oil and petrochemicals.
KVM scope of work:
SIMOPRIME extension Panels
Delivery period: 2019
SIEMENS /TR
Independent Power Project
The project is being developed on a BOO (Build Own Operate) basis, with finance from international banks (HSBC, Standard Chartered, SMBC) and numerous local banks (Banque Saudi Fransi, National Commercial Bank, Samba, Arab National Bank, Saudi British Bank and Saudi Hollandi Bank).
The power station consists of six identical groups of equipment provided by Siemens, each with a net output of 654.5 MW. Each block has a 2+2+1 configuration consisting of two SGT6-5000F Combustion Turbines, two Heat Recovery Steam Generators, and one SST6-4000 Steam Turbine. At 52%, it is the most efficient power station of its kind in the country, and one of the largest in the world, at 3,927 MW
KVM scope of work:
SIMOPRIME extension Panels for IPP factory.
Delivery period: 2019
SIEMENS /TR
